Project Profile: Tyvek® Fluid Applied and Ronald McDonald House®

  • Section menu

  • Search

Dupont site menu

Contextual Menu

Project Profile: DuPont™ Tyvek® Fluid Applied WB helps Protect World’s Largest Ronald McDonald House® 

Tyvek® Fluid Applied WB Helps Protect Ronald McDonald House® Quote

THE GOAL: In 2009, Ronald McDonald House Charities® of Chicagoland and Northwest Indiana decided to build the world’s largest Ronald McDonald House® in the heart of Chicago. One goal was for the building to achieve Leadership in Energy and Environmental Design (LEED®) Silver certification.

THE CHALLENGE: High-rise construction requires speed of application and the ability to work in a wide range of conditions. Construction on the new Ronald McDonald House® began in January 2011 and the DuPont™ Tyvek® Fluid Applied WB was applied over a 4-month period beginning in September. During this timeframe, the installers encountered a wide range of weather conditions, including some very cold temperatures. The one constant was the ease of application they experienced.

THE SOLUTION: Applied in a one-coat application by spraying or power rolling, DuPont™ Tyvek® Fluid Applied WB delivers superior protection, offers enhanced durability and saves time by providing two to three times the coverage of competitive fluid applied materials. The product can be applied at temperatures as low as 25°F and can be applied over damp surfaces. It will not wash off in rain while curing.

“The fact that this product does not require a primer and is installed in a single-coat helped speed up application. And, because it has great elasticity, our team is confident that the Tyvek® Fluid Applied WB will stretch with building components as they expand and contract over time, helping to maintain the long-term integrity and performance of the air and water barrier.”

Michael Lucansky, Project Manager
Antunovich Associates

 

PROJECT CREDITS

Project: Ronald McDonald House®
Project Size: 15-Stories. 100,000 ft2
Project Type: Healthcare/Hotel: New Construction
Location: Chicago, Illinois
Architect: Antunovich Associates
General Contractor: Bulley & Andrews
DuPont™ Tyvek® Certified Installer: J.P. Larsen

DUPONT PRODUCTS USED ON THIS PROJECT:

 

Click here to view the PDF of this Project Profile.