Valve Timing

The valve open/close action durations of the multiple valves opening and closing in WAVE would affect the timing of downstream steps and are thus included in the WAVE UF modeling as shown in Figure 1.

Note:  WAVE assumes 6 valves per train and a valve open/close action duration of 10 seconds by default.

Figure 1: Additional equipment specifications for UF modeling in WAVE