CCRO - FINAL CALCULATION AND REPORT GENERATION

Once the system design inputs are available in WAVE, WAVE can be run to model the system. Most of the details of actions that can be performed to generate, modify and handle the reports are the same as for RO/NF/ROSC design. This section highlights the differences and tables unique to CCRO.